Aqua MODIS Continuity products reprocessed to address crosstalk correction
Platform | Aqua |
---|---|
Instrument | MODIS |
Source | MODAPS,LAADS |
Issue | news |
Last Updated | 2023-02-07 18:30:00 |
Start | 2023-02-07 18:30:00 |
End | 2023-05-31 23:59:59 |
Description |
The MODIS Continuity products (C1.1), CLDMSK_L2_MODIS_Aqua, CLDPROP_L2_MODIS_Aqua, CLDPROP_D3_MODIS_Aqua, and CLDPROP_M3_MODIS_Aqua, spanning between April 17, 2022 (DOY 107) through July 26, 2022 (DOY 207) have been reprocessed to correct for the Level-1B crosstalk drift that was evident in the Aqua longwave infrared (LWIR) photovoltaic (PV) bands 27-30, following the last Aqua safe-mode event that occurred between March 31, 2022 (DOY 090) and April 14, 2022 (DOY 104). |